Fort Hays State University Akers Energy Center
Hays, KS
Generator Replacement
Prime Contractor- Self Performed
Completion Date: 5/10/2022
Contract Amount: $2,057,539.00
Scope of Work
This project consisted of removing and replacing (2) existing 900KW generators with (2) new 1130KW generators including a steel catwalk. A new 60’x40’ generator and associated equipment concrete pad at 6ft was installed with galvanized handrails and stairs. Two new 1500KVA medium-voltage transformers were installed. Two new 300KVA load banks were installed, and roughly 100LF of medium-voltage electrical ductbank was installed.