NAVFAC Pier 2 Load Center 2
Newport, RI
Electrical Upgrades & Repairs to Naval Pier Shore Power System
Project Location: Newport, RI
Government Agency: NAVFAC
Contract Number: N4008520C0037
Prime contractor: 100% self-performed
Estimated Completion Date: May 2023
Transformer Size: 2000KVA – 2500KVA
Switchgear Amperage: 3000A
Primary Voltage of Transformer: 13800V
Contract Amount: $5,931,005.00
Scope of Work
The Midwest Electrical Construction Inc. team repaired Load Center 2 and incidental related work. Repairs within Load Center 2 include the following:
-
Removal and replacement of the two 13.8kV (primary) substation class transformers
-
Transformers included load tap changers and we custom designed to fit into the existing building
-
Completed complex jack and slide movement of transformers to set inside the existing building
-
-
3000A, 480V electrical switchgear for feeding shore hoods.
-
Replaced electrical building interior lighting.
-
Interior electrical low-voltage distribution equipment and branch circuit wiring.
-
Demolition of interior walls to allow for removal of electrical equipment, and repair of the existing utility cable vaults.
-
Demolition and replacement of two (2) existing ship-to-shore power connection stations and associated under-pier 480V power and control wiring to the Load Center 2 480V switchgear and incidental related work.
-
Arc Flash & Coordination Study
-
Testing & commissioning of the new electrical system